First Community Credit Union

Byrne & Jones used a product called Concure in the floor slab to provide the following benefits:

  • Flooring can usually be installed 30 days after pouring the concrete
  • Eliminates moisture problem PERMANENTLY!
  • Compatible with ALL floor coverings and adhesives and coatings
  • Densifies concrete and contributes to increased concrete strength up to 125%
  • Stops ASR (Alkali-Silica-Reactivity)
  • Contributes to blocking radon gas
  • Works as a shrink reducing admix (SRA)
  • Eliminates surface dusting
  • Reduces and in some cases eliminates most slab curling due to uneven slab curing

First Community Credit Union
First Community Credit Union
First Community Credit Union
First Community Credit Union
First Community Credit Union
First Community Credit Union

SCOPE

Floor slab, roadway widening, curbs & sidewalks

SPECIFICS

Byrne & Jones Concrete installed all of the concrete for this project. The specifications were provided by Clayco. Clayco was the general contractor for this project.