Project Overview

Location: Dardenne Prairie, Missouri 

Client: St. Charles County Parks

Project Duration: October 2023 – March 2025

Contract Value: $1,410,220

Project Scale: 23,000+ square feet of safety surfacing

Case Study: Kinetic Park in Dardenne Prairie, MO

St. Charles County Parks envisioned transforming their existing teen center into a multi-generational destination playground that would serve families and park users of all ages and abilities. The ambitious Phase 2 expansion required expert installation across challenging hillside terrain while maintaining strict ADA compliance and integrating equipment from multiple manufacturers.

A Complex Canvas To Build On

The site presented immediate challenges that highlighted the importance of experienced playground professionals. Steep contours and varying elevations across the hillside meant that every square foot of safety surfacing installation had to be precisely calculated for ADA compliance. There was virtually no margin for error when working with tiered surfaces that needed to accommodate playground equipment from seven different manufacturers.

“What I’m most proud of is how our team collaborated effectively to navigate complex design conflicts while maintaining safety and quality,” reflects Jack Kelly, our project manager who led the installation. The collaborative approach would prove essential as the project evolved.

Kinetic Park Playground Installation
Kinetic Park Playground Equipment

Where Expertise Meets Innovation

Our scope encompassed far more than traditional playground installation. We integrated equipment from Kompan, Berliner, Elephant Play, Percussion Play, Miracle, Little Tikes, and KidsTale—demonstrating our capability to work seamlessly with any manufacturer while maintaining design cohesion. The safety surfacing alone showcased our technical artistry: synthetic turf playground grass navigating complex hillside contours, custom-designed poured-in-place rubber featuring three distinct color patterns, and decomposed granite pathways winding through a specialized log maze.

The project also included Coverworx pavilions and shelters, and even indoor pickleball court coloring—illustrating the diverse capabilities that make Byrne & Jones a comprehensive partner for municipal projects.

Where Plans Meet Reality

Midway through the project, added scope introduced Kompan tower systems that hadn’t been part of the original site design. The manufacturer’s plans assumed flat surfaces, but our site featured the very slopes and elevations that made the playground unique. When we encountered conflicts between the tower footing layouts and existing concrete wall foundations, a less experienced contractor might have simply flagged the problem and waited for direction.

Instead, our certified playground safety inspectors and experienced superintendents took a proactive approach. We worked directly with Kompan and the project’s landscape architects to redesign solutions that resolved every conflict while maintaining both safety integrity and the original design vision.

A picture of playground surfacing going in at Kinetic Park

“Byrne & Jones’s greatest achievement was our proactive problem-solving—especially in resolving conflicts between the added Kompan Tower design and the existing site,” Kelly notes. “They focused on safety and worked seamlessly as a team, ensuring we met project standards under challenging circumstances.”

Collaboration in Action

Throughout the project, we maintained close coordination with Friese Construction, the general contractor for Phase 2. This partnership exemplifies our approach to municipal projects: we respect the overall project hierarchy while bringing specialized playground expertise that ensures compliance and safety. The relationship was so successful that it positioned both companies for future collaborative opportunities.

As construction progressed around us, our access became increasingly limited to skid-steer equipment only. Rather than compromise on quality, we adapted our installation methods to maintain the precision required for ADA compliance across the complex terrain.

Results That Speak Volumes

While the original timeline extended due to the added scope elements, we never rushed the critical safety and compliance aspects of the installation. Every change order from Byrne & Jones resulted from client-requested scope additions—not from project management oversights or unforeseen complications.

The transformed playground is expected to double or triple annual park attendance, successfully converting the space into a true destination for families throughout the region. Community response has been immediate and enthusiastic: “This park is amazing!” posted one community member on Facebook, while DG2 Design Landscape Architecture, the project’s landscape architects, praised our work: “You did a fantastic job constructing it! Thank you for being a great partner.”

The success of Phase 2 led St. Charles County Parks to contract Byrne & Jones as the General Contractor for Phase 3, a $5.38 million expansion currently underway. This progression from specialized subcontractor to general contractor demonstrates the trust and confidence we’ve earned through our expertise and collaborative approach.

Kinetic Park Under ConstructionKinetic Park Finished Playground 1

What This Means for Your Project 

The Kinetic Park Phase 2 project demonstrates how expert collaboration, innovative problem-solving, and meticulous attention to safety and accessibility standards can successfully navigate complex design conflicts and scope changes. For park directors, city officials, and mayors considering similar projects, this case study illustrates several key capabilities:

Multi-Manufacturer Integration: We successfully coordinated seven different equipment manufacturers into one cohesive playground experience, proving our ability to work with whatever suppliers and playground design best meet your community’s needs and preferences.

ADA Compliance Expertise: Our six certified playground safety inspectors ensured every installation met accessibility standards, even across challenging tiered terrain with steep contours—expertise that’s essential for municipal projects serving diverse community populations.

Proactive Problem-Solving: When unexpected conflicts arose, we didn’t just identify problems—we developed and implemented solutions in collaboration with all stakeholders, keeping projects moving forward rather than stalling in bureaucratic delays.

Transparent Project Management: Our change order practices reflect scope additions, not project management failures, giving you confidence in budget predictability and professional accountability.

The success at Kinetic Park Phase 2 reflects our commitment to turning complex municipal visions into accessible, safe, and engaging community destinations. Whether your project involves challenging terrain, multiple manufacturers, or evolving scope requirements, we bring the expertise and collaborative approach that ensures successful outcomes for communities and municipal leaders alike.

About Byrne & Jones Parks Construction

Byrne & Jones Parks Construction specializes in turnkey Parks Construction services for schools, municipalities, and private organizations. With expertise in project management, construction, and ongoing support, we partner with clients to create facilities that serve both immediate needs and long-term community goals.

Ready to transform your community’s playground vision into reality? Contact Byrne & Jones Parks Construction to discuss how our proven expertise can deliver exceptional results for your next project, regardless of complexity or site challenges.